yh1122银河国际|主頁|欢迎您

Enterprise performance
Bombardier Phase I Project of Tianjin Airport Economic Zone
Time:2020-06-28

The project includes two separate buildings: No. 1 maintenance hangar and No. 2 power station. The roof structure adopts the primary and secondary truss system. The maximum span of the main truss system is 88m, which provides ample space for the repair and maintenance of each series of Bombardier business aircraft.

  • Baidu
    sogou